Sepulveda Transit Corridor Options (train between SFV and Westside)
(stc-lametro.hub.arcgis.com)
from Habahnow@sh.itjust.works to losangeles@lemmy.world on 19 Aug 2025 15:47
https://sh.itjust.works/post/44412646
from Habahnow@sh.itjust.works to losangeles@lemmy.world on 19 Aug 2025 15:47
https://sh.itjust.works/post/44412646
In the link you can see the different proposed alternatives for what metro is thinking of implementing to get a connection from the San Fernando Valley and the Westide.
My understanding is that there is only a bus line that connects the two, so the current alternative method of travel to a bus is taking the very congested 405 fwy.
An additional link with more detailed information: us.planengage.com/sepulvedacorridor/page/execsum
#losangeles
threaded - newest
The 90-day comment period will end on August 30, 2025. Comments will be accepted throughout the comment period online, via email, project hotline and U.S. Mail as follows:
Comment form
Email: sepulvedatransit@metro.net
Project information line: 213.922.7375
U.S. Mail: Peter Carter, Metro, One Gateway Plaza, MS 99-22-6, Los Angeles, CA 90012